久久久国产精品网站-国产一区自拍视频-久久国产精品免费看-国产精品盗摄在线观看 久久国产精品偷99_日韩动漫av在线播放一区_亚洲女

Hello, welcome to visit the official website of Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.!

news

Product

contact us

Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.

Address: Dawa Lingang Economic Zone, Panjin City

Website: www.shanghaiyuanbi.com


Sales of a company

General Manager: Zhao Lei 18241448558

Sales Minister: Liu Wenli 18841483313

Sales Second Company

General Manager: Zhao Shuxiu 13188225517

Sales Minister: Pei Xiaojun 13804148185

Sales three companies and foreign trade

General Manager: Dai Gang 13604976693

Sales Minister: Chen Liming 18524274505

Sales four companies

General Manager: Chen Tieyan 18341472200

Sales Director: Meng Lin 19904144892

How to prevent longitudinal expansion and contraction of PE pipe fittings

Your current location: Home >> News >> Industry News

How to prevent longitudinal expansion and contraction of PE pipe fittings

Date of release:2019-07-17 Author: Click:

The thermal expansion and contraction of PE pipe fittings during construction in winter or summer can easily damage the PE pipe fittings. Therefore, it is necessary to prevent the longitudinal expansion and contraction of the PE pipe fittings. Large-caliber water supply pipe


The PE pipe fittings should be laid in a serpentine shape in the pipe trench, with a slight curved arc, leaving a margin for expansion and contraction, and when installing the PE pipe, there should be no expanders or double-drum short pipes instead of expanders. When making PE pipe fittings buttresses and town piers, both sides should be simultaneously poured with concrete at one time. The bottom foundation of PE pipe fittings must be cushioned with fine sand and not less than 100 mm. After the PE pipe fittings are installed, the 500mm backfill work on both sides and the top of the pipe must be backfilled and compacted, and the backfill compaction coefficient is not less than 95%.

大口徑給水管材

When PE pipe fittings are installed in hot weather, they should be constructed as far as possible from night to 8:00 in the morning. The atmospheric temperature is low, and the pipeline is properly contracted and then backfilled and the final joint meets. It must be layered and compacted to prevent the pipeline from expanding and contracting. Large internal stress damage.

The address of this article:http://www.shanghaiyuanbi.com/en/news/385.html

Key word:大口徑給水管材,大口徑給水管材廠家,大口徑給水管材哪家好

Recently browse:

Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
name
Contacts
Telephone
Telephone
mailbox
mailbox
address
address